<p>By Prevail Inegbenose</p>
<p><strong>Nigeria’s grid-connected power plants utilised an average of 86 per cent of their available generation capacity in August 2026, according to the Nigerian Electricity Regulatory Commission (NERC).</strong></p><p class="ari-link"><strong>Read also:</strong> <a href="https://sparknewsdaily.com.ng/nigeria-unido-move-to-strengthen-livestock-traceability-food-safety/">Nigeria, UNIDO Move to Strengthen Livestock Traceability, Food Safety</a></p>
<p>NERC’s August 2026 Operational Performance Fact sheet showed that an average of 4,758 megawatts (MW) was available for dispatch during the month, with 4,102MW utilised on average.</p><p class="ari-link"><strong>Read also:</strong> <a href="https://sparknewsdaily.com.ng/afrilabs-naseni-take-nigerian-innovations-from-grassroots-to-global-market/">AfriLabs, NASENI Take Nigerian Innovations From Grassroots to Global Market</a></p></p>
<p>Highlights of the report which was posted on the Commission&#8217;s X handle on Wednesday showed that several generating plants recorded high utilisation levels during the period, led by Afam_2 with a 99 per cent load factor.</p>
<p class="ari-link"><strong>Read also:</strong> <a href="https://sparknewsdaily.com.ng/king-confident-of-victory-ahead-of-el-kanemis-clash-with-unid/">King Confident of Victory Ahead of El-Kanemi’s Clash with UNID</a></p><p>Kainji_1 followed with a 98 per cent load factor, while Egbin_1 recorded 96 per cent, indicating that the three plants operated close to their available generation capacity during the month.</p>
<p>The figures provide an assessment of the operational performance and utilisation of Nigeria’s grid-connected generating fleet for August 2026.</p>

