<p>By Prevail Inegbenose</p>
<p><strong>Nigeria’s grid-connected power plants utilised an average of 86 per cent of their available generation capacity in August 2026, according to the Nigerian Electricity Regulatory Commission (NERC).</strong></p><p class="ari-link"><strong>Read also:</strong> <a href="https://sparknewsdaily.com.ng/felix-morka-bags-political-communicator-of-the-year-award/">Felix Morka bags Political Communicator of the Year award</a></p>
<p>NERC’s August 2026 Operational Performance Fact sheet showed that an average of 4,758 megawatts (MW) was available for dispatch during the month, with 4,102MW utilised on average.</p><p class="ari-link"><strong>Read also:</strong> <a href="https://sparknewsdaily.com.ng/adc-raises-alarm-over-alleged-pvc-buying-in-northern-nigeria/">ADC Raises Alarm Over Alleged PVC Buying in Northern Nigeria</a></p></p>
<p>Highlights of the report which was posted on the Commission&#8217;s X handle on Wednesday showed that several generating plants recorded high utilisation levels during the period, led by Afam_2 with a 99 per cent load factor.</p>
<p class="ari-link"><strong>Read also:</strong> <a href="https://sparknewsdaily.com.ng/frsc-orders-probe-into-otedola-bridge-tanker-inferno-blames-excessive-speed/">FRSC Orders Probe into Otedola Bridge Tanker Inferno, Blames Excessive Speed</a></p><p>Kainji_1 followed with a 98 per cent load factor, while Egbin_1 recorded 96 per cent, indicating that the three plants operated close to their available generation capacity during the month.</p>
<p>The figures provide an assessment of the operational performance and utilisation of Nigeria’s grid-connected generating fleet for August 2026.</p>

